National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


壶关县| 石河子市| 桐城市| 皋兰县| 鹿泉市| 南岸区| 曲周县| 德兴市| 南康市| 施秉县| 文化| 黄陵县| 嵩明县| 唐海县| 东辽县| 陵水| 台北市| 新建县| 马尔康县| 翼城县| 花莲市| 奉化市| 五莲县| 明水县| 胶南市| 秦皇岛市| 墨江| 珠海市| 崇礼县| 辽阳市| 商洛市| 木兰县| 新化县| 迁安市| 满城县| 南澳县| 温泉县| 开平市| 元朗区| 衡东县| 安义县|